Always-on scheduling intelligence

Scheduling intelligence for industrial operations.

Planning and scheduling for operations where time, resources and money move together. ProdPlan for manufacturing. Vantage for real estate development.

RECOVERY BOARD
ON PLAN
Plant
Constraints modeled
Equipment down
Disruption
Choose recovery
Decision
Runnable planShips T+5.9h
PREP
CHECK
SHIP
A
A
A
A
B
B
B
B
C
C
C
C
Drag a job
$0
Late
$0
Overtime
$25
WIP
$0
Churn
$25
Total
Least floor churn
Move 3 jobs
Protect Friday ship
Add one overtime shift
Recover capacity
Use alternate capacity
The Challenge

The day reality breaks the spreadsheet

Factory managers already know the plan will change. The hard part is knowing which jobs must move, which jobs can stay, and what each recovery choice costs before the floor starts chasing the wrong answer.

1
planner bottleneck

The plan lives in one head

The spreadsheet works because one planner knows the exceptions. When that person is out, plant knowledge becomes a bottleneck.

Hrs
spent firefighting

Every delay starts a rebuild

A job runs slow, a resource waits on QA, a material arrives late. The old plan may still be close, but nobody knows what can safely stay put.

$?
unmeasured tradeoffs

Tradeoffs stay invisible

Can you hit Friday without overtime? What is the cost of moving one customer up? Most teams decide by pressure, not by seeing the real operating tradeoff.

5
constraints affected

Floor churn becomes normal

A rush order or machine-down event can ripple through the whole production flow. Without a repair strategy, too many jobs move.

There's a better way
Two products

One engine. Two industries.

A factory and a tower are the same mathematics wearing different clothes: finite resources, hard sequences, immovable dates and a cost for every choice. We build a product for each, because the physics differ even when the problem does not.

Live

ProdPlan

Manufacturing

Production scheduling for multi-stage batch manufacturers.

Mix tanks, totes, fill lines, shifts, changeovers, materials and due dates — modelled as the hard constraints they actually are. When a line goes down or a rush order lands, ProdPlan re-solves the plant and returns the trade-offs in money.

  • Proven-optimal schedules, not heuristic guesses
  • Complete Pareto frontier across 12+ objectives
  • Immutable snapshots — every solve reproducible
  • Deployed and running today
Commissioning

Vantage

Real Estate Development

Programme scheduling for developers and major projects.

Activities, calendars, crews, equipment, procurement, permits and cash — with an exact cost ledger to the fils. When an approval moves or a facade shipment slips, Vantage compares feasible recovery options and prices each one before you commit.

  • Construction logic, not a repurposed factory model
  • Independent validator and cost calculator must both accept a plan
  • Change cost kept separate from execution cost
  • In commissioning — first developer programmes now

Both products share one discipline: model the real constraints, search hard for alternatives, verify independently, express the trade-off in money, and leave the decision with the operator.

Core Capabilities

What Alacrity does for the plant

It builds runnable schedules from real constraints, keeps checking them against reality, and gives managers recovery choices instead of another spreadsheet panic.

Build a real factory schedule

Model equipment, work centers, labor, materials, changeovers, compatibility rules, due dates, and work already in progress in one planning system.

See the tradeoffs before you commit

Compare fastest, lowest-labor, least-disruptive, and best-on-time plans so the cost of speed, overtime, and churn is visible.

React when reality changes

When a job runs late, a machine goes down, or materials slip, Alacrity checks whether the plan still holds and repairs what needs to move.

Anticipate likely disruptions

AI agents keep reviewing the plan, trying alternatives, learning from prior attempts, and precomputing contingency responses where possible.

Protect the floor from churn

Respect completed and in-progress work when rebuilding the plan, so recovery does not casually rewrite what the operators already started.

Run custom what-if scenarios

Ask what happens if a key resource goes down, a job finishes two hours late, staffing changes, or a rush order jumps the queue.

Order to ship
Modeled flow
Due dates
Top priority
Low churn
Repair posture
How It Works

The operating loop behind every recovery

Alacrity is not a one-time planning run. It is a plant-aware loop for building, checking, repairing, and approving schedules as the day changes.

01

Model the plant

Capture equipment, work centers, shifts, labor, materials, changeovers, compatibility rules, due dates, and active work.

02

Build the plan

Generate a schedule that meets due dates first, avoids unnecessary disruption second, then balances labor, speed, inventory, cost, and utilization.

03

Watch reality change

Track execution drift, completed work, in-progress jobs, downtime, material changes, rush orders, and staffing constraints against the active plan.

04

Compare recovery options

Show the least-disruptive path, the fastest path, the lowest-labor path, and the delivery-risk impact before the manager commits.

05

Commit and keep running

Managers stay in control. Alacrity recommends and explains; your team chooses the policy, approves the move, and keeps the floor aligned.

Human operators approve the recovery; the system keeps the constraints honest.
How It Helps

Built for the questions plant leaders ask

The pilot focuses on operational questions that usually require a senior scheduler, a spreadsheet, and several tense meetings to answer.

Fast
answers when the day changes

Check whether the active plan still holds, then repair the right portion when it does not.

Less
unnecessary floor churn

Respect completed and in-progress work so the recovery does not rewrite the past.

Clear
tradeoff visibility

See delivery risk, overtime pressure, moved jobs, and throughput effect side by side.

Early Access

Pilot framing: one plant, real constraints, real disruptions

Alacrity is built for high-changeover operations where equipment, labor, materials, due dates, and customer priorities interact. We are onboarding design partners who want to test the system against their actual schedule pressure.

Mapped
Key constraints modeled
1 mo
Production data to start
Many
Disruption scenarios

Built for factories where constraints interact

Multi-stage production
High-changeover operations
Constraint-heavy plants
Capacity-constrained teams
Pricing

Start with a focused scheduling pilot

The fastest path is not a heavy integration project. Start with a bounded plant model, prove the disruption workflows, then decide how deeply to connect live systems.

Pilot

Prove the recovery loop with real data

Contact Us

Scoped pilot engagement

  • One plant and one month of production data
  • Factory constraint model and schedule baseline
  • Disruption demo against your real scenarios
  • Hands-on onboarding with the founding team
Most Popular

Production

Operate the schedule day to day

Contact Us

Per-site pricing

  • Runnable schedule generation for the facility
  • Change monitoring and low-churn repair
  • What-if scenarios for managers and planners
  • Structured CSV/API data ingestion to start
  • Integration scoping for ERP/MES/WMS data
  • Priority support during rollout

Enterprise

Scale scheduling intelligence across sites

Custom

Tailored to your requirements

  • Multi-site operating model and reporting
  • Custom approval policies and controls
  • Private deployment options by engagement
  • Dedicated implementation plan
  • Advanced integration and security review
  • Executive capacity and ROI readouts
Factory-data pilot
Human approval
Integration scoped per site
No production services touched during evaluation
Our Team

Built for real operating pressure

Alacrity sits at the intersection of factory operations, production scheduling, and AI systems that learn from real attempts.

Portrait of Nathan Petty

Nathan Petty

Founder & CEO

Georgia Institute of Technology alumnus in Applied Mathematics and Industrial Engineering with a multi-decade career in production-control systems, including over a decade as a lead Boeing software engineer for automated assembly systems supporting 787, 777X, F-15, 737, and other factories with multi-billion-dollar aircraft production flow.

Production Control SystemsIndustrial EngineeringAutomated AssemblyScheduling Systems
Portrait of Ryan Stelt

Ryan Stelt

President, US Business Development & Operations

Over 30 years of hands-on manufacturing operations experience, including practical plant constraints, supplier pressure, staffing realities, and customer delivery expectations.

Manufacturing OperationsFactory OperationsSupply ChainProcess Optimization

Why this problem matters

Factories do not fail because planners lack effort. They fail because the plan has to coordinate equipment, work centers, materials, crews, changeovers, due dates, and work already moving through the floor.

The real product is not a black-box answer. It is a reliable operating layer that helps a manager understand what changed, what can stay put, what must move, and what each option means for delivery, labor, throughput, and cost.

That is the wedge: high-changeover, constraint-heavy plants where spreadsheets carry too much operational risk and every disruption teaches the system what a better recovery looks like.

For plant managers

Fewer firefights, clearer recovery options, and less dependence on one heroic scheduler.

For owners and executives

Throughput, delivery confidence, overtime pressure, and true operating tradeoffs in one place.

For investors

A factory-specific learning loop for a painful, defensible wedge in production scheduling.

Why “Alacrity”?Alacrity — eagerness, speed, readiness. The quality of responding to change without hesitation. That's what we want for your factory: a schedule that responds to reality with speed and precision.
Innovation One Tower, DIFC, Dubai, UAE
FAQ

Practical pilot questions

Clear answers for teams evaluating whether Alacrity fits their plant before committing to a larger rollout.

Still have questions?

Our team is here to help. Reach out and we'll get back to you within 24 hours.

Pilot With Your Real Factory Data

Bring one plant, one month of data, and the disruptions that keep showing up. We'll show the recovery options.

Run a scheduling pilot around the questions your team already asks: can we take the order, hit Friday without overtime, recover from an equipment-down event, and move fewer jobs when reality changes?

Real constraints
Disruption scenarios
Human approval

Prefer to reach out directly?

[email protected]